Free tool

Is your FM maintenance contract as profitable as you think?

Model how reactive callouts, engineer costs, planned maintenance and contract pricing affect your margin.

  • A first result in two minutes
  • No sign-up to use
  • Full report by email, if you want it
1

Select a contract model

A fixed-price contract behaves very differently from one where reactive work is billed separately.

Cost-plus / management feeComing soonCosts passed through to the client with an agreed fee or percentage on top.
2

Enter your baseline

Annual figures. We've preloaded an example contract so you can start exploring straight away.

Contract
Planned maintenance
Reactive maintenance
Labour and overheads
Targets
Scenario explorer · Fixed-priceWhat happens to your contract margin?
Contract revenue
£200,000
Total costs
£168,503
Scenario profit
£31,497
Scenario margin
15.7%
−6.7 pts vs baseline 22.4%Floor 15.0% · Target 20.0%
+20
−50+150
+5%
−5%+20%
+5%
0%+30%
0%
0%+25%
0 pts → 75%
−20 pts+15 pts
0%
−10%+15%
3

Understand what drives your margin

Everything below updates as you change the baseline or move a slider. The same analysis goes into your emailed report.

Callout headroom+4 calloutsThis contract can absorb 4 more included reactive callouts before the margin drops below 15.0%, at an all-in cost of £309 per callout.
Price to hit your target margin+5.3%The annual fee would need to rise by £10,628 to £210,628 to restore a 20.0% margin under this scenario.
Cost per productive hour£44.80 / hrEngineers cost £33.60 per paid hour, but at 75% utilisation each productive hour costs £44.80. A 10-point gain would release about 168 productive hours a year — roughly 67 reactive callouts without extra headcount.

Scenario comparison

Annual margin under four sets of assumptions.

Optimistic£51,537 · 25.8%
10% fewer callouts, utilisation up 5 points and PPM delivered to plan, with 2% labour inflation
Expected£44,896 · 22.4%
Your baseline forecast with no changes
Stress£14,149 · 7.1%
25% more callouts, 8% labour inflation, 10% PPM overrun, 5% supplier increase and utilisation down 5 points
Your scenario£31,497 · 15.7%
The slider settings in the scenario explorer

Margin sensitivity

Change in annual profit if each driver moves 10% against you, from your current scenario.

Engineer labour cost
−£9,012
Labour utilisation (−10%)
−£6,272
Reactive callout volume
−£5,725
PPM delivery hours
−£5,645
Subcontractor costs
−£3,000
Overheads
−£2,000
Travel expenses
−£700

Observations worth reviewing

Drawn from your assumptions, not industry averages.

Your margin is most sensitive to engineer labour cost. A 10% move against you would reduce projected profit by £9,012.
Margin headroom is thin: the contract can absorb only 4 more included callouts — 3% of the forecast volume — before the margin drops below 15.0%.
This scenario sits 4.3 points below your 20.0% target. The annual fee would need to rise by £10,628 to £210,628 to restore a 20.0% margin under this scenario.

Biggest margin improvement opportunities

The operational changes with the greatest modelled impact on this contract.

1Improve schedulingUtilisation up 10 points+£6,641+3.3 pts
2Annual price reviewContract fee up 3%+£6,000+2.5 pts
3Deliver PPM to planRemove the PPM effort overrun+£2,688+1.3 pts

This is an illustrative model based on the assumptions you enter. Labour cost is allocated rather than additional payroll spend, travel time is treated as part of utilisation so it is never counted twice, and labour inflation is assumed to make up 60% of the cost of a reactive callout. Repeat visits are costed at 60% of an original callout. It is not financial advice.

4

Take it into your next pricing meeting

We’ll email you a six-page PDF built from the numbers on this page — the kind of document an MD can take into a contract review.

Report type
Shown on the report cover

We use your details to send or prepare the report you’ve asked for. See our privacy policy.

CLEVERLY · CONTRACT PERFORMANCE TOOLSFM Contract Profitability ReviewFixed-price maintenance contract · 14 October 2026
Expected revenue£200kper year
Expected margin22.4%On target
Stress margin7.1%Below floor
Your scenario15.7%−6.7 pts vs expected
Contract margin by scenario
Optimistic
25.8%
Expected
22.4%
Stress
7.1%
Your scenario
15.7%
Key consideration: Engineer labour cost is the biggest single driver of margin on this contract — a 10% adverse move costs £9,012 a year.
Internal review · all assumptions shownPage 1 of 6
  1. 1Executive summary and key observations
  2. 2Revenue and cost breakdown
  3. 3Scenario comparison
  4. 4Margin sensitivity and break-even
  5. 5Key assumptions and risks
  6. 6Improvement opportunities and next steps
From simulation to control

See what is actually happening to your contract margin

Cleverly tracks the jobs, quotes, supplier costs and invoices behind every contract, so you can watch real profitability as the year unfolds.